国产女人和拘做受视频免费美国黄色一级毛片_91精品福利麻豆专区_国产美女a做受大片免费_久久精品国产久精国产思思_久久69精品久久久久久hb_wwwa级片日韩免费一区
石化設(shè)計(jì)成功案例
成功案例 ? 項(xiàng)目列表
Shandong Shenda Chemical Co.,Ltd. MTO Catalyst Dust Extration Project

Lanke Provides fresh catalyst tanks top dust extration system for Fund Energy Changzhou Co.,Ltd 300,000 MT/YR Polypropylene(PP) Project 1,000,000 MT/YR Methanol-to-Olefins (DMTO) unit. With LPEC as  the general contractor, the afford scope of Lanke included instruments and control systems, pipes and  pipe fittings,installation, training and guidance of stat-off and debugging, and the dust extration will be put into operation in May 15th, 2015.







POWERED BY 上海藍(lán)科 COPYRIGHT?2010 - 2014 滬ICP備05062916號(hào)

部分圖片和文章來源于網(wǎng)絡(luò),如有侵權(quán)請(qǐng)聯(lián)系刪除